Choosing an ERP consulting firm

How to choose an ERP consulting firm: process, criteria, questions

Choosing an ERP consulting firm is the decision by which a company picks the firm that will run its ERP project, comparing candidates on scope, method, team, pricing model and references. A sound choice starts from a written scope, not from a software demo: firms are assessed against the same needs, the same scenarios and the same criteria, and proposals are compared on the same line items.

Last updated: · MindDX

01Selection process

Choosing an ERP consulting firm, step by step

Each step uses the output of the one before. Skipping steps usually ends in proposals that cannot be compared and a scope that grows later.

  1. Clarify the need and the scope

    Write down which processes will change, which systems need a connection, the state of your data and the local regulatory flows. Proposals requested before the scope is written are prepared on each firm’s own assumptions.

  2. Build a long list

    List the firms that have worked in your sector and production type, implement the software you are considering and can offer a team close to you. At this stage the aim is not to eliminate but to see who could meet the scope.

  3. Send a request for proposal (RFP)

    Send every firm on the long list the same scope, the same questions and the same proposal structure: company profile, processes, current systems, data migration, localisation, expected timeline and evaluation criteria.

    Free ERP RFP Builder

  4. Narrow it to a shortlist

    Read the answers with the evaluation table below. The firms that understand the scope without rewriting it, state their assumptions openly and answer the questions stay on the shortlist.

  5. Hold demos and reference calls

    Ask the shortlisted firms for a demo built on your own scenarios instead of a prepared presentation — for example, an order’s journey from quotation to production, shipping and invoice. Then talk directly to one of the firm’s customers in a similar situation.

  6. Compare the proposals

    Read the proposals on total cost of ownership and on the same line items, not on the day rate: licence, consulting, data migration, integration, training, support and the time your own team will give.

    Free ERP Total Cost of Ownership (TCO) Framework

    Five line items to check in an ERP quote

  7. Sign the contract

    Write the scope, the acceptance criteria, the roles, change management and post-go-live support into the contract. Everything said in the proposal and the demo should also be in the contract.

    What to check in the contract: on the Implement page

02Evaluation criteria

Which criteria should you assess a consulting firm on?

Fill in the same table for every candidate. The «How to test it» column makes sure the answer comes from evidence, not from a presentation.

Criteria for assessing an ERP consulting firm
CriterionWhy it mattersHow to test it
Sector experienceA firm that has worked with similar processes knows the critical points of your business from the start and asks the right questions.Ask for completed projects in your sector and production type, together with their scope.
MethodIf the scope is not validated before the implementation commitment, the real scope surfaces during the project and causes rework.Ask how the scope is validated before the commitment, and in which written deliverable.
Team and local presenceTraining, testing and go-live need a team that speaks your language, knows local regulation and is at your side when needed.Ask for the people who will work on the project by name, with their roles and experience; ask whether the sales team stays on the project.
Data migration and integrationProjects struggle most with cleaning the data that comes from the old system and with the connections to other systems.Ask who is responsible for data migration and integration, and how both are rehearsed before go-live.
Localisation and e-documentsIn Türkiye, the e-invoice, e-archive, e-dispatch and e-ledger flows, the chart of accounts and taxes are a precondition of go-live.Ask to be shown how the e-document flow is set up, who maintains it and how it is tried with real documents.
Pricing modelIf the price is tied to the days spent (man-days), the budget grows with the scope; if it is tied to a written scope, a change is discussed separately.Ask in writing which scope assumption the proposal rests on and how a request outside the scope is priced.
Post-go-live supportGo-live is not the end; questions, corrections and new needs pile up in the first weeks.Ask about the scope, channel and language of post-go-live support, and how version upgrades are planned.
References you can callThe first-hand account of a similar customer shows far more than a prepared presentation.Ask for at least one customer you can talk to, and ask them yourself how the project went.

If you want to add a weight column to the table, you set the weights: your scope tells you which criterion matters more to you. This page proposes no ready-made weight or score.

Man-day consulting versus value-based ERP

03Questions to ask

Ten questions to ask a consulting firm

Ask these questions in the same way in the request for proposal and in the demo meeting, and ask for the answers in writing.

  1. How do you validate the scope, and which scope assumption does your proposal rest on?
  2. Which projects have you run in our sector and production type, and can we talk to one of those customers?
  3. Who will work on the project, and will the team named in the proposal stay the same throughout?
  4. Is your price tied to the days spent or to a written scope, and how is a request outside the scope priced?
  5. Who carries out the data migration, who is responsible for cleaning the data, and how is the transfer rehearsed?
  6. Which systems will you integrate with, and who will maintain those connections?
  7. How do you set up the e-invoice, e-archive, e-dispatch and e-ledger flow, and how do you test it before go-live?
  8. How do you decide between standard features, configuration and custom development, and how do you plan version upgrades?
  9. Whom on our team do you expect to give time, and to which work?
  10. How is support delivered after go-live, and where and in which language are questions raised?

Going with Odoo: the Odoo implementation consulting guide

04Warning signs

Warning signs: when to be careful

None of these signs rules a firm out on its own, but each one calls for a written answer before the contract.

Why do ERP projects overrun their budget?

05Manufacturing companies

Extra points for manufacturing companies

In a manufacturing company, the consulting firm must be able to show the production processes with your own data. In demos and reference calls, test these points in particular:

  • Bill of materials (BOM)

    How multi-level bills of materials with variants and revisions will be migrated, and who will maintain them.

  • Routings and work centres

    How operation sequences, work-centre capacities and subcontracted operations will be reflected in the system.

  • Material requirements planning (MRP)

    How material planning will be set up for your production type, make-to-stock or make-to-order.

  • Lot and serial tracking

    At which points traceability from raw material to shipment is recorded, and how it is queried backwards.

  • Quality

    How incoming, in-process and final inspections, non-conformance records and corrective actions will be tracked.

In the glossary: Bill of materials (BOM) · Routing · MRP (Material Requirements Planning) · Lot and serial tracking

What is ERP? A guide to ERP software and how to choose it

06The MindDX approach

The MindDX approach

At MindDX, consulting starts from evidence, not from software. Assess comes first: Checkup measures maturity independently of software; Discover Scope is added for a new system, Audit for an installed Odoo, Zoho or abas ERP system, and the output is the validated scope. Then Implement, at a fixed price based on the validated scope.

Explore AssessExplore Implement

07Questions

Frequently asked questions about choosing an ERP consulting firm.

Write the scope first, then test the firms against the same scope and your own production scenarios. In the demo, see how your bills of materials, routings, material planning, lot and serial tracking and quality inspections would work in the system; talk to a customer with a similar production type; and ask in writing who handles data migration and integration, what the price depends on and how post-go-live support works.

Start the selection from the scope

X-ray first, then diagnosis: choosing a consulting firm before the scope is clear is writing a prescription before the diagnosis. Let’s set the starting point together in a meeting.